@@ -1,5 +1,5 @@
|
|
|
# Test Plan: Hardware Instancing of Mesh Draw Calls
|
|
|
-### **1 Introduction:**
|
|
|
+### **1.0 Introduction:**
|
|
|
|
|
|
Hardware Instancing is a method of reducing draw calls by bundling repeated instances of mesh and material within a scene or view. This plan covers high level risk mitigation plans for this feature as a two phase implementation.
|
|
|
|
|
@@ -7,12 +7,12 @@ Hardware Instancing is a method of reducing draw calls by bundling repeated inst
|
|
|
|
|
|
* RFC [https://github.com/o3de/sig-graphics-audio/pull/114](https://github.com/o3de/sig-graphics-audio/pull/114)
|
|
|
|
|
|
-### **2 Defect Tracking Issues:**
|
|
|
+### **2.0 Defect Tracking Issues:**
|
|
|
|
|
|
Bugs will be tracked with Github Issues (GHI) primarily entered in [https://github.com/o3de/o3de](https://github.com/o3de/o3de).
|
|
|
Labels will include `kind/bug`, `feature/graphics`, `sig/graphics-audio`, and initially `needs-triage`.
|
|
|
|
|
|
-### **3 Test Schedule and Entry Criteria:**
|
|
|
+### **3.0 Test Schedule and Entry Criteria:**
|
|
|
|
|
|
##### **3.1 Remaining Test Tasks:**
|
|
|
|
|
@@ -34,7 +34,7 @@ This section should be used to determine the entry criteria for accepting the so
|
|
|
- Any blocking platform issues are addressed or scope of testing is changed to address open issues
|
|
|
- Hooks for feature testing are available
|
|
|
|
|
|
-### **4 Risks:**
|
|
|
+### **4.0 Risks:**
|
|
|
|
|
|
Identify what the critical risk areas are as identified through the Risk Analysis process defined by the QA team, such as:
|
|
|
|
|
@@ -64,7 +64,7 @@ Identify what the critical risk areas are as identified through the Risk Analysi
|
|
|
- Frame time measurements are a suitable proxy for performance impact in manual testing
|
|
|
- Draw call counts can be measured in stable scenarios to determine integrated functionality
|
|
|
|
|
|
-### **5 In Scope:**
|
|
|
+### **5.0 In Scope:**
|
|
|
|
|
|
* HW instancing on various platforms (PC, Linux, iOS, Android)
|
|
|
* Editor, game launcher, dedicated server
|
|
@@ -81,7 +81,7 @@ Identify what the critical risk areas are as identified through the Risk Analysi
|
|
|
|
|
|
* Profile testing
|
|
|
|
|
|
-### **6 Out of Scope:**
|
|
|
+### **6.0 Out of Scope:**
|
|
|
|
|
|
* Dynamic mesh
|
|
|
* Skinned mesh
|
|
@@ -90,7 +90,7 @@ Identify what the critical risk areas are as identified through the Risk Analysi
|
|
|
* Shape components
|
|
|
* AuxGeom
|
|
|
|
|
|
-### **7 Test Approach:**
|
|
|
+### **7.0 Test Approach:**
|
|
|
|
|
|
##### **7.1 Test Method**
|
|
|
|
|
@@ -113,7 +113,7 @@ This is a listing of the test strategies that will be used for test execution. E
|
|
|
|
|
|
* Mobile scaled test level 1K entity scenario with mixed batches of mesh required for mobile testing. Existing 10K levels are showing 333ms to 500ms frame times; we would want
|
|
|
|
|
|
-### **8 Test Exit Criteria:**
|
|
|
+### **8.0 Test Exit Criteria:**
|
|
|
|
|
|
- `priority/critical` and `priority/blocker` issues are closed appropriately
|
|
|
- Specified functionality is confirmed to exist and function.
|