A full interactive Calendar UI built for Vanilla JS or use in other frontend frameworks.

#javascript #js #vanillajs #ui #frontend #webdev #website #html #css #jquery

Roxin Cernica e6e5bfed0a agendaDay tests should use agendaDay 11 年之前
build fb0202e6a5 update bower shim readme 12 年之前
demos a1c4f11f48 MISC little stuff 12 年之前
lang 564ee6a9a9 [2.0] FullCalendar language files 12 年之前
src a1c4f11f48 MISC little stuff 12 年之前
tasks 05ab0a7cf8 [2.0] build system updates, esp for language file generation 12 年之前
tests e6e5bfed0a agendaDay tests should use agendaDay 11 年之前
.bowerrc 9181e8be2e bower components go in lib/, all demos and tests reference them directly 12 年之前
.gitignore 9181e8be2e bower components go in lib/, all demos and tests reference them directly 12 年之前
Gruntfile.js 3746117815 fix lint problems in misc js files 12 年之前
bower.json cc1ce91780 have bower use specific moment version 12 年之前
changelog.md 016f43f2cc bump to 2.0.0-beta2 12 年之前
fullcalendar.jquery.json 016f43f2cc bump to 2.0.0-beta2 12 年之前
jscs.conf.js 3746117815 fix lint problems in misc js files 12 年之前
jshint.conf.js 39dd3f08f4 misc comments 12 年之前
karma.conf.js 80fe8c1c96 new tests for ambiguous moments, moment construtors, moment range querying 12 年之前
license.txt b7e644bf4e change to single MIT license. update banners in source files 13 年之前
lumbar.json 1f5b6490a3 break apart date_utils.js 12 年之前
package.json e3c9f185b7 move karma-related dependencies into the repo. use karma-cli 12 年之前
readme.md dc5d985ab4 new docs on writing automated tests 11 年之前

readme.md

FullCalendar - Full-sized drag & drop event calendar

This document describes how to modify or contribute to the FullCalendar project. If you are looking for end-developer documentation, please visit the project homepage.

Getting Set Up

You will need Git, Node, and NPM installed. For clarification, please view the jQuery readme, which requires a similar setup.

Also, you will need the grunt-cli and bower packages installed globally (-g) on your system:

npm install -g grunt-cli bower

Then, clone FullCalendar's git repo:

git clone git://github.com/arshaw/fullcalendar.git

Enter the directory and install FullCalendar's development dependencies:

cd fullcalendar && npm install

Development Workflow

After you make code changes, you'll want to compile the JS/CSS so that it can be previewed from the tests and demos. You can either manually rebuild each time you make a change:

grunt dev

Or, you can run a script that automatically rebuilds whenever you save a source file:

./build/watch

You can optionally add the --sourceMap flag to output source maps for debugging.

When you are finished, run the following command to write the distributable files into the ./build/out/ and ./build/dist/ directories:

grunt

If you want to clean up the generated files, run:

grunt clean

Style Guide

Please follow the Google JavaScript Style Guide as closely as possible. With the following exceptions:

if (true) {
}
else { // please put else, else if, and catch on a separate line
}

// please write one-line array literals with a one-space padding inside
var a = [ 1, 2, 3 ];

// please write one-line object literals with a one-space padding inside
var o = { a: 1, b: 2, c: 3 };

Other exceptions:

  • please ignore anything about Google Closure Compiler or the goog library
  • please do not write JSDoc comments

Notes about whitespace:

  • use tabs instead of spaces
  • separate functions with 2 blank lines
  • separate logical blocks within functions with 1 blank line

Run the command line tool to automatically check your style:

grunt check

Before Contributing!

If you have edited code (including tests and translations) and would like to submit a pull request, please make sure you have done the following:

  1. Conformed to the style guide (successfully run grunt check)

  2. Written automated tests. View the Automated Test README